Skip to content
HQC — High Quality Construction
Bloom hotel building, current render
HQC · Bloom · BY Radisson Individuals · Melasti

Bloom

A design hotel on the Bukit — the first romantic address on Bali, adults-only and run to a five-star standard.

Active construction · Q1 2028

Delivery
Q1 2028
Tenure
Leasehold
Selected collection
Design hotel, 103 hotel rooms · Melasti
From
Price on request
01 · The idea

Bali’s first romantic hotel, run to a five-star standard

Architecture you photograph. Evenings you don’t

Bloom territory walkway at sunset
Melasti cliffs coastline from the air
Bloom territory walkway at sunset

Bloom Hotel Melasti is an adults-only design hotel on the Bukit — Instagrammable architecture, planted rooftop gardens and scenic photo zones, run to a five-star standard as a BY Radisson Individuals hotel. One hundred and three keys across four typologies open onto pool, courtyard or natural-landscape aspects, with large panoramic windows throughout. It is short-stay only, so every guest arrives for the same reason: the place itself.

Location
Bukit · Melasti, Ungasan
Land
Pink (tourism) zone
Inventory
103 keys
Operator
BY Radisson Individuals
Building permit
PBG obtained
Completion
Q1 2028 · hotel launch Q2 2028
02 · location

Melasti, on the cliffs of the Bukit

Bloom sits in Ungasan, at the southern tip of Bali — five minutes on foot from Karma Kandara beach and a short buggy ride from Melasti. More than thirty restaurants lie within three kilometres and the GWK Cultural Park is fifteen minutes away: a dense, established leisure neighbourhood, not a remote plot.

  1. Karma Kandara beach5 min on foot
  2. Melasti beach3 min by buggy
  3. Restaurants30+ within 3 km
  4. GWK Cultural Park15 min
Open Melasti in Maps →

HQC project location · Bloom

Managed by

Operated to BY Radisson Individuals' own hospitality standard

BY Radisson Individuals

Bloom is operated as a BY Radisson Individuals hotel to a five-star standard — global distribution through the GDS, the Radisson Rewards loyalty programme (30M+ members) and hotel reporting to the USALI standard — so ownership stays hands-off: a professionally managed asset, not a self-run one.

BY Radisson Individuals hotel in Melasti, delivered as managed inventory
03 · the tour

Tour video

Aerial · Melasti, Bukit
04 · amenities

Life at the hotel

Wellness & water

Royal Spa complex

A full spa delivered in partnership with Royal Spa

Central courtyard pool

The compositional heart of the courtyard between the buildings

Yoga & wellness

A dedicated yoga space alongside the spa

Evenings & gardens

Speakeasy & live jazz

A vinyl speakeasy bar and a restaurant with live music

Rooftop gardens

Planted rooftop gardens and scenic photo zones

Full service

Concierge, laundry, parking and a guest-privilege card

06 · the residences

By typology

One hundred and three keys in four typologies — Standard, Superior, Deluxe and Luxury — delivered turnkey, furnished and equipped, with large panoramic windows. Ground-floor homes can add a private terrace or direct pool access; upper floors open onto a balcony. Per-typology areas and floor plans are set out in the presentation pack.

Bloom Standard room Type 1 floor plan preview
2 layouts
Area
28.7–29.4 m²
View
Courtyard · landscape
Request pricing →

Preview includes Standard Type 1 and Type 2 layouts from the presentation source; full-resolution sheets are sent as part of the presentation.

TypologyAreaView
Standard28.7–29.4 m²Courtyard · landscape
Superior34.3–34.4 m²Courtyard · pool
Deluxe37.8–38.2 m²Pool view
Luxury39–46.6 m²Pool · natural landscape
07 · why it's safe to own

The reassurance, before you ask

Operator

BY Radisson Individuals' hospitality standard

Bloom is operated as a BY Radisson Individuals hotel to a five-star standard — global distribution through the GDS, the Radisson Rewards loyalty programme (30M+ members) and hotel reporting to the USALI standard — so ownership stays hands-off: a professionally managed asset, not a self-run one.

Build guarantee

10-year structural guarantee

Warranty scope covers load-bearing structures and pool bowls, with seismic and hydro insulation specified.

Legal & tenure

Leasehold 39 + 30 via PT HQC

Bloom is under construction on commercial tourism-zoned land in Melasti, built by HQC’s in-house teams — frame, seismic and hydro insulation, finishes and MEP.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    Construction start — Q4 2025

    Bloom is under construction on commercial tourism-zoned land in Melasti, built by HQC’s in-house teams — frame, seismic and hydro insulation, finishes and MEP.

  2. 02

    Completion — Q1 2028

    Residences are delivered turnkey: finished, furnished and equipped, with large panoramic windows, ready for the operator to take over.

  3. 03

    Hotel launch — Q2 2028

    Bloom opens as a BY Radisson Individuals hotel and is run to a five-star standard — owners hold a hands-off, professionally managed asset.

09 · questions

What buyers ask us first

Who operates Bloom?

Bloom is operated as a BY Radisson Individuals hotel to a five-star standard; owners hold a professionally managed, hands-off asset rather than a self-run one.

What does the 39+30 lease mean?

A thirty-nine-year leasehold with a contracted priority extension, held through the Indonesian entity PT HQC. The exact terms are set out in the presentation pack.

What guarantees come with the build?

Ten years on the load-bearing structures and the pool bowls of the hotel, and twelve months on finishing — backed by our in-house MEP lab and furniture factory.

Is the land secure for foreign buyers?

Bloom sits on pink-zoned (tourism) land — the correct designation for a foreign-held hotel residence on Bali.

Can owners live in their residence?

Bloom is an adults-only hotel run on short stays, so residences are hospitality inventory rather than a home to live in.

What is included at handover?

A turnkey, furnished and equipped residence with large panoramic windows, operator-ready for short-stay rental.

10 years

10-year structural guarantee

12-month guarantee on finishing

Other projects

Aerial view of Ardhana hotel and central pool
Active constructionQ3 2028

Ardhana Hotel

Bukit

61 keys — 58 apartments and 3 loft suites

Managed by WyndhamLeasehold

Price on request

View
Black Rock villa exterior
Construction completeOperating since 2024

Black Rock

Bukit

3 barnhouse villas — operating since Aug 2024

Leasehold

Price on request

View
Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.5–46.6 m²

REA Award 2025

Managed by AccorLeasehold

Price on request

View
Request

Get the Bloom presentation

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.