Construction quality that builds trust
We don't sell renderings. We build properties whose quality can be verified directly on the construction site, any day.
- IDR 2.99T
- Company portfolio value, including Pandawa in design
- 814
- Units across 7 complexes
- Up to 35%
- Value growth by completion
- Up to 8%
- Rental yield
Company-level indicators, not a guarantee of future results.
2023
Founded in 2023
IDR 1.32T
Value of projects under construction
Global Quality Standards: Partnering with leading international hotel brands



Partnerships that drive higher returns
- +30% to ADR — a higher nightly rate driven by the brand name
- +35% to RevPAR — higher revenue per available room
- +12% to occupancy — driven by global loyalty programs and direct bookings
HQC on Bali
A developer that builds what it sells
The standards of the world's leading hoteliers. Confirmed by partnership with Wyndham, Accor and Radisson.
HQC is a vertically integrated developer — design, construction, MEP, furniture and management under one roof. The only developer on Bali partnered with Wyndham, Accor and Radisson, and the only foreign developer building under the Accor brand on the island.
A short look at the island, the sites and the construction standard behind the residences — from our own drone footage.

The collection of residences: from concept to operation
Open the catalogue →
Satori Hotel
Nusa Dua
116 hotel rooms, 28.5–46.6 m²
REA Award 2025
Price on request
View
Satori Villas
Nusa Dua
38 private-pool villas, 48–128 m², 1–4 bedrooms
Price on request
View
Aravita Residence
Nusa Dua
Gated Japandi villa club — 75 villas, 1–4 bedrooms
Price on request
View
Ardhana Hotel
Bukit
61 keys — 58 apartments and 3 loft suites
Price on request
View
Ardhana Villas
Bukit
23 villas — 16 Luxury and 7 Fengshui — completed June 2025
Price on request
View
Bloom
Bukit
Design hotel, 103 hotel rooms · Melasti
Price on request
View
Dzen Green Fields
Ubud
Boho villas among the rice terraces — 10 villas
Best resale case: 8 of 10 villas resold, investor returns of 35% to 170% per annum.
Past results, not a guarantee.
Price on request
View
Our portfolio comprises 7 complexes, including Pandawa in design. Satori and Ardhana each have separate hotel and villa cards; these 8 cards present 6 complexes, while Pandawa is not yet in the showcase.
Independent recognition

- 2025
Resort Construction of the Year — Indonesia
Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.
- 2025
Luxury Hospitality Interior Design of the Year — Indonesia
Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.
How international construction standards reach resort real estate
Open-book costing
Land, materials and labour accounted for openly — no padding, no surprises
Audited MEP
Plumbing and electrical under independent lab control — not the local minimum
Own furniture factory
Joinery, beds and casegoods produced in our own Bali workshop
Premium equipment
ABB electrical systems, KONE lifts and lab-tested climate and pool equipment
Three-stage QA
Engineering, finishing and operator hand-over inspections on every unit
Registered PT entity
An Indonesian company holds the lease — you sign with a registered legal entity
Why Bali holds value
A year-round tropical season, an established five-star hospitality market on the Bukit and in Nusa Dua, and ownership paths — leasehold and freehold — open to foreign investors.

Real standards instead of renderings. Check the quality for yourself
Watch the film →
Structural Build Quality
Regular technical inspection of construction work with photo and video documentation of key stages
Key structural decisions undergo additional review by specialized engineers.
Grade 27+ MPa concrete: certified batches with laboratory control of composition
10-day concrete curing — control of the concrete mix, pouring technique, curing process, and formwork removal timing
Seismic resilience: joints engineered for the region's extreme load conditions

Legal Immunity
PBG before work begins: the building permit is issued and verified before any equipment arrives on site
Land audit (BPN): cadastral boundary verification involving neighbours and a notarized deed

Engineering & Operations
World brands: ABB and KONE systems with same-day service
MEP engineering: manifold-based utility distribution — leak protection and easy access
Plumbing and electrical inspected by our in-house lab on every project.
Regular technical inspection of construction work with photo and video documentation of key stages
In-house production: solid teak furniture made at our own 4,000 m² factory

Protection built into every contract
We minimize risk before construction even begins. All leasehold extension terms, technical warranties, and legal parameters of the property are fixed in a notarized agreement — no hidden terms, no legal grey areas.
Guaranteed extension
The right to extend the leasehold at a fixed cadastral value — protection from market speculation.
Legal certainty
Warranties on the structure, finishing, and the PBG permit are written directly into the contract.
Land immunity
A threefold boundary check through the land registry (BPN) with sign-off from neighbours — completely eliminating territorial disputes.
Three-tier audit
The legal integrity of every transaction is verified by three independent notary pools.
Built to last
10 years
10-year structural guarantee
12-month guarantee on finishing
What investors ask us first
See all questionsWho is HQC?
HQC (High Quality Construction) is a vertically integrated Bali developer of villas, apartments and branded resorts. Design, construction, MEP, an in-house furniture factory and our own management company sit under one roof, with 800+ people on the ground: 100+ staff engineers and managers, plus 700+ people working on company construction sites every day. It is the only developer on Bali partnered with Wyndham, Accor and Radisson — and the only foreign developer building under the Accor brand on the island.
What legal entity do I sign with?
Every contract sits under the registered Indonesian company PT High Quality Construction — you sign with a registered legal entity, not an individual or a nominee. Legal due diligence on each plot, including all permits, is handled by our in-house legal team.
What is the difference between leasehold and freehold?
Leasehold is a long-term lease — the standard structure for foreign-held resort residences on Bali — with priority extension agreed up front. Freehold (Hak Milik) is full ownership. The completed Dzen Green Fields villas in Ubud are held freehold, which is uncommon for foreign buyers and a meaningful advantage.
Does HQC actually deliver, or is this an off-plan promise?
Three completed developments demonstrate delivery: Black Rock in Ungasan, completed and income-producing since 2024; Dzen Green Fields in Ubud, completed and sold out; and the villa quarter of Ardhana Residence, completed in 2025. New buyers can still enter completed projects through resale, and active builds are documented with dated site reports.
Who manages the residences after completion?
Where a global operator is in place, the residence is run to that brand standard rather than self-managed. Satori is operated by Accor, Ardhana by Wyndham Hotels & Resorts under a signed agreement, Bloom is a BY Radisson Individuals hotel, and Black Rock is run by Farsight Management. Owners hold a professionally managed asset.
How is build quality controlled on an island known for cracking, leaking builds?
Every structure is engineered with seismic and hydro insulation from the foundation up, with monolithic walls, multi-stage water filtration and an independent water source on each project. Mechanical, electrical and plumbing systems are designed to international standards and inspected by our in-house MEP lab, with premium equipment — ABB electrics, KONE lifts — and regular technical inspection with photo and video documentation of every key stage.
What does the structural guarantee cover?
HQC gives a ten-year structural guarantee on hotel residences and villas alike — load-bearing structures, the roof and the pool shells — plus a one-year guarantee on finishing and engineering systems. It is backed by an in-house MEP lab and our own furniture factory, so the people who build the systems also stand behind them.
Where are the projects located?
The portfolio spans three of the strongest areas on Bali. Satori and Aravita sit in Nusa Dua (Sawangan), within a kilometre of the Mulia, Apurva Kempinski and St. Regis. Bloom, Ardhana and Black Rock sit on the Bukit, minutes from Karma Kandara and Melasti beaches. Dzen sits among the rice terraces, four minutes from central Ubud.
Is HQC recognised by the industry?
Satori Nusa Dua Resort won two Real Estate Asia Built Environment Awards 2025, presented in Singapore in June 2025: Luxury Hospitality Interior Design of the Year — Indonesia and Resort Construction of the Year — Indonesia.
What infrastructure comes with a residence?
Each project carries its own resort-grade infrastructure — typically a spa, pools, restaurants, fitness, concierge and a gated, secured territory — with project-specific touches such as Aravita's yoga chalet, Bloom's Royal Spa partnership and speakeasy bar, and Ardhana's rooftop lounge and coworking. Units are delivered fully finished and furnished.
Can I see the construction before I commit?
Yes. HQC publishes dated site reports and walk-throughs for every active build, and arranges site visits at the registered Bali office by appointment. The most reliable proof that a developer delivers is the construction itself.
Can I resell my unit later?
Yes. Units are individually titled on their lease, or freehold where applicable, and can be transferred — which is why completed, sold-out projects such as the Ardhana villas, Dzen and Black Rock remain available to new buyers through resale.
Request the Investor Pack
Project brochures, construction standards and completed-project data — sent directly to you.
- The full catalogue with floor plans
- Project details from the HQC team
- A direct line to the team

Project brochures

Construction standards

Completed-project data
Prefer to talk first? Reach us directly.

