Skip to content
HQC — High Quality Construction
Construction

Watch every project rise

Dated site reports and walk-throughs from each active build — because the best proof that a developer delivers is the construction itself.

New site reports added as each build progresses
5,650
m² completed
33,535
m² under construction
20,018
m² in design
10 years
Structural guarantee
2–3×
technical inspections a day

10 years

10-year structural guarantee

12-month guarantee on finishing

02 · Why we publish

Transparency is part of what we build

A site you can watch is a promise you can check

Most developers ask buyers to trust a render. We publish dated reports and walk-throughs from every active site — permits, foundations, slabs, finishing — so the proof of delivery is the building itself, not a brochure. Built to audited international standards; verify in the open.

Satori villas under construction in Nusa Dua, from the HQC drone flyover
03 · Active builds

Dated, from each site

Black Rock, Dzen Green Fields and the Ardhana villas are already completed — see the Track record section on the Why HQC page.

Satori Nusa Dua

Site report · August 2026

From the August 2026 report: the first-floor slab of the apartment block is concreted and column reinforcement is under way; four villa pools are complete and roofing is progressing across the villa quarter; the groundwater tank and the electrical switchboard room are finished, with waterproofing of the underground structures in progress. Villa permit (PBG) in hand; managed on delivery by Accor.

View project →
Satori villa roofs and the tower crane, from the August 2026 site report
Satori villa foundations and block walls, from the August 2026 site report

Ardhana Residence

Site report · August 2026

From the August 2026 report: finishing has begun on the ground floor of the boutique hotel — wall masonry in the restaurant area is nearing completion, ceilings and plasterboard are going in and bathroom tiling has started; formwork is installed on the roof ahead of concreting, and the ground-floor slab of the main body is being poured. The Luxury and Fengshui villa quarters were completed in June 2025 and are occupied.

View project →
Ardhana boutique hotel frame beside the completed villas, from the August 2026 site report
Ardhana roof slab reinforcement before concreting, from the August 2026 site report

Bloom · BY Radisson Individuals

Site report · August 2026

From the August 2026 report: excavation of the construction pit is under way and the engineering team is setting out the works on site — the first stage after the building permit (PBG). Open pre-sale launched in June 2025; construction started in Q4 2025 towards completion in Q1 2028.

View project →
Bloom construction pit with the site crew, from the August 2026 site report

Aravita

Site report · August 2026

From the August 2026 report: the foundation footings of the first villas are formed and poured and slab reinforcement is being tied, with the site office and perimeter in place — the below-grade waterproofing that protects a building through Bali’s wet seasons comes next.

View project →
Aravita villa foundations being formed, from the August 2026 site report
Aravita foundation footings with formwork, from the August 2026 site report
04 · Method

Built to international standards, inspected every day

Every HQC building is engineered against international construction standards, audited by our in-house MEP lab and inspected on site two to three times a day, with photo and video documentation of every key stage before a key changes hands — the same discipline whether it carries an Accor, Wyndham or Radisson flag.

  1. 01

    Engineering stage

    Seismic core, hydro-insulation and structural frame signed off before the build goes vertical — the load-bearing work the structural warranty stands behind.

  2. 02

    Finishing stage

    Mechanical, electrical and plumbing rough-in plus finishes inspected against spec, much of it produced in our own furniture factory for a controlled chain.

  3. 03

    Operator stage

    A final review to the hospitality operator’s brand standard before handover, so a unit performs to the flag it carries from day one.

05 · On video

Walk the sites in motion

Site reports from our own cameras — the Satori report plays in English; the Ardhana, Aravita and Bloom reports currently play with Russian voice-over. Project walk-throughs and site tours also publish to our public YouTube channel.

Satori site report — opening frame
Ardhana site report — opening frame
Aravita site report — opening frame
Bloom site report — opening frame
06 · Construction completed

Already standing

Black Rock villa exterior, completed

Black Rock

Construction completed · 2024

Three gated villas in Ungasan, completed, furnished and operating since August 2024.

Dzen Green Fields villa among the palms, completed

Dzen Green Fields

Construction completed · 2025

Ten freehold villas in Ubud, completed in May 2025 and occupied — proof the pipeline crosses the finish line.

A completed Ardhana villa with its private pool

Ardhana · villa quarter

Construction completed · June 2025

The Luxury and Fengshui villa quarters of Ardhana Residence, completed in June 2025 and occupied while the boutique hotel rises alongside.

Follow the build

Get construction updates by email

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.