10-year structural guarantee
1,234 footing piles, seismic frame and hydro insulation are part of the engineering scope.

A gated Japandi villa club in Sawangan — seventy-five private homes for slow, long-stay living, two minutes from the beach.
Active construction · Q2 2028
Wabi-sabi calm, held inside one closed ecosystem



Aravita is a fully pedestrian, gated community of seventy-five private villas in Sawangan, Nusa Dua, conceived around the Japandi philosophy — Japanese wabi-sabi softened by Scandinavian restraint — for conscious long-stay living from a month upward. Inside its closed ecosystem sit a sunset lounge, a kids club, a spa, a yoga shala, two restaurants, a community centre and a gym, all reachable on foot. Every villa runs ABB electrical systems pre-assembled and tested in HQC’s own MEP laboratory, with automated doors and tunable kitchen glass; construction stands on a pile foundation of 1,234 footings, with limestone drawn from HQC’s own quarry.
Sawangan is the quiet southern edge of Nusa Dua — Bali’s most established luxury enclave. The Mulia, the Apurva Kempinski, the St. Regis and HQC’s own Satori all stand within the same kilometre.
HQC project location · Aravita

Aravita concept film
Sunset lounge
An evening lounge inside the gates
Two restaurants
On-site dining for daily life
Spa
A wellness suite for residents
Yoga shala
A dedicated space for morning practice
Gym
A fitness room within the community
Kids club
A supervised space for families
Community centre
A shared hub at the heart of the club
24/7 reception
Round-the-clock front desk and concierge
Gated & secured
A closed, controlled territory
Perimeter walks
Pedestrian paths around the grounds
Wildlife sound barriers
Acoustic deterrents protect the green
Lightning protection
Built-in safety systems throughout






Seventy-five private villas in five typologies, fifty-one to two hundred and seventy-two square metres, one to four bedrooms — each with its own private pool, terrace and sun deck, finished to HQC standard with ABB electrical systems.

Preview layout shown here; full-resolution floor plans are sent as part of the presentation.
| Typology | Area | View |
|---|---|---|
| 1-bedroom villa | 51 m² | Private garden |
| 2-bedroom villa | 90 m² | Private garden |
| 3-bedroom villa | 121 m² | Private garden |
| 4-bedroom villa | 173 m² | Private garden |
| Luxury villa | 272 m² | Private |
1,234 footing piles, seismic frame and hydro insulation are part of the engineering scope.
A 31-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.
A 31-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.
ABB electrical systems are pre-assembled and tested in our own MEP laboratory; construction stands on a pile foundation of 1,234 footings, with limestone drawn from HQC’s own quarry.
Villas are delivered fully finished and furnished, with in-house construction, MEP, joinery and furniture.
Seventy-five private villas in one to four bedrooms, plus a Luxury villa — interiors run from fifty-one to two hundred and seventy-two square metres, each with its own private pool.
Japandi — Japanese wabi-sabi combined with Scandinavian minimalism — inside a fully pedestrian, gated ecosystem designed for calm.
It is designed for conscious long-term stays, from a month upward, with amenities to support living rather than a quick holiday.
Automated door systems, adjustable kitchen-glass tinting and ABB electrical systems assembled and tested in HQC’s own MEP laboratory.
A thirty-one-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.
On a pile foundation of 1,234 footings, with limestone from HQC’s own quarry and ABB electrical systems pre-assembled in our own MEP laboratory — backed by a 10-year structural and 12-month finishing guarantee.
Sawangan beach is two minutes away, and the five-star core of Nusa Dua — the Mulia, the Apurva Kempinski and the St. Regis — sits within a kilometre.
10 years
10-year structural guarantee
12-month guarantee on finishing

Nusa Dua
116 hotel rooms, 28.5–46.6 m²
REA Award 2025
Price on request
View
Bukit
61 keys — 58 apartments and 3 loft suites
Price on request
View
Bukit
Design hotel, 103 hotel rooms · Melasti
Price on request
ViewPrefer to talk first? Reach us directly.