Skip to content
HQC — High Quality Construction
Ardhana Residence, aerial render of the hillside
HQC · Bukit, Ungasan · Villas + boutique hotel

Ardhana Hotel

61 keys — 58 apartments and 3 loft suites

Active construction · Q3 2028

Delivery
Q3 2028
Tenure
Leasehold
Selected collection
61 keys — 58 apartments and 3 loft suites
From
Price on request
01 · A residence with its own hotel

A residence with its own five-star hotel infrastructure

Designed on Feng Shui and Vastu, greened to the rooftops

Ardhana completed villa with private pool
Ardhana boutique hotel facade with greenery
Ardhana hotel courtyard facade

Ardhana sits on an Ungasan hillside above the ocean, in direct sightline of the GWK Garuda statue, pairing two villa quarters — Luxury and Fengshui — with the Smart quarter, a boutique hotel that gives the whole community its own five-star infrastructure. The villas were completed in June 2025 and are now occupied; the boutique hotel, operated by Wyndham, completes in Q3 2028. The architecture is an eclectic Asian register, and the entire site — including the villa roofs — is greened and planned by Feng Shui and Vastu, then engineered to HQC’s full spec.

Floors
Villas 1 · hotel 2
Pools
Villa + hotel
Operator
Wyndham
Design
Feng Shui · Vastu
02 · location

Bukit, Ungasan — above the ocean and the Garuda

Ardhana looks out over the ocean and the GWK Garuda statue from the Bukit at Ungasan, with the south’s beaches, surf and international schooling all within a short drive of the gate.

  1. Melasti beach10 min
  2. Pandawa beach10 min
  3. Jimbaran12 min
  4. Surf spots15 min
  5. Cambridge international school7 min
Open Ungasan in Maps →

HQC project location · Ardhana

Managed by

Operated to Wyndham's own hospitality standard

Wyndham

Ardhana’s boutique hotel is operated by Wyndham Hotels & Resorts under a signed management agreement — the world’s largest hotel franchise network, across upward of ninety countries — so the hospitality side runs to a global brand standard, not self-managed.

Signed Wyndham management agreement for the boutique-hotel component
03 · the tour

Tour video

Aerial · HQC drone footage
04 · amenities

Hotel-grade living, on a hillside

Resort

Spa

A wellness suite for owners and guests

Yoga studio

A dedicated studio on site

Pool bar

Pools across the villas and the hotel

Fitness

A gym for residents

Restaurant

A managed dining room on site

Rooftop lounge bar

A rooftop lounge with an ocean view

Coworking

A shared workspace within the community

Kids’ room

A supervised space for families

Service

Five-star service

Run to the operator’s hospitality standard

Gated & secured

A controlled, walking-friendly site

Walking park

Landscaped grounds and a walking park

06 · the residences

By typology

Two villa quarters — Luxury and Fengshui — sit alongside the Smart quarter, a boutique hotel of apartments and lofts. Every unit is turnkey-furnished, with filtered pools on the villas and ocean, Garuda, jungle or park aspects depending on position on the hillside.

Ardhana Loft suite 79.6 square metre two-floor layout preview
Area
79.6 m²
View
Ocean · Garuda
Request pricing →

Preview layout shown here; full-resolution floor plans are sent as part of the presentation.

TypologyAreaView
Loft suite (3)79.6 m²Ocean · Garuda
Standard apartment (58)25–30 m²Ocean · jungle · Garuda
07 · why it's safe to own

The reassurance, before you ask

Operator

Wyndham's hospitality standard

Ardhana’s boutique hotel is operated by Wyndham Hotels & Resorts under a signed management agreement — the world’s largest hotel franchise network, across upward of ninety countries — so the hospitality side runs to a global brand standard, not self-managed.

Build guarantee

10-year structural guarantee

The completed villa quarter demonstrates the structural system before the boutique hotel completes.

Legal & tenure

Leasehold 30 + 30 via PT HQC

Construction of the villa quarter was completed in June 2025, with the boutique-hotel foundations laid alongside — delivery you can walk through, not an off-plan promise.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    Villas completed · June 2025

    Construction of the villa quarter was completed in June 2025, with the boutique-hotel foundations laid alongside — delivery you can walk through, not an off-plan promise.

  2. 02

    Soft opening · September 2025

    The villa quarter held its soft opening as the hotel’s lower floors took shape, with the first two levels framed through autumn 2025.

  3. 03

    Site flyover · January 2026

    A January 2026 aerial documented the completed villas and the rising boutique hotel on the Ungasan hillside.

  4. 04

    Boutique hotel completes · Q3 2028

    The Wyndham-operated boutique hotel completes in Q3 2028, bringing the community’s five-star infrastructure fully online.

09 · questions

What buyers ask us first

Are the villas still available?

The villas were completed in June 2025 and are now occupied; availability is through resale, while the Wyndham-operated boutique hotel completes in Q3 2028.

Who manages Ardhana?

The boutique hotel is operated by Wyndham Hotels & Resorts under a signed management agreement, so the hospitality side runs to a global brand standard rather than being self-managed.

What does the 30+30 lease mean?

A 30-year leasehold with a priority 30-year extension, held through the developer’s registered Indonesian structure on residential-zoned land.

What unit types are there?

Two villa quarters — sixteen Luxury villas (1–3 bed, 70–155 m²) and seven Fengshui villas (48 m²) — alongside the Smart quarter, a boutique hotel of fifty-eight Standard apartments and three two-storey Loft suites.

What views can I get?

The ocean, the GWK Garuda statue, the jungle or a park, depending on the unit and its position on the hillside.

What design principles were used?

The site is planned by Feng Shui and Vastu in an eclectic Asian register, with greenery carried across the whole community — including the villa roofs.

What guarantees come with the build?

A 10-year structural guarantee on the hotel units and the villas alike — load-bearing structures, the roof and pool shells — and a 12-month finishing guarantee, backed by monolithic walls, multi-stage water filtration and forced ventilation with air-conditioning.

How far are the beaches?

Melasti and Pandawa are each about ten minutes away, Jimbaran is twelve, surf spots are fifteen, and a Cambridge international school sits seven minutes from the gate.

10 years

10-year structural guarantee

12-month guarantee on finishing

Other projects

Bloom hotel building render
Active constructionQ1 2028

Bloom

Bukit

Design hotel, 103 hotel rooms · Melasti

Managed by BY Radisson IndividualsLeasehold

Price on request

View
Black Rock villa exterior
Construction completeOperating since 2024

Black Rock

Bukit

3 barnhouse villas — operating since Aug 2024

Leasehold

Price on request

View
Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.5–46.6 m²

REA Award 2025

Managed by AccorLeasehold

Price on request

View
Request

Get the Ardhana presentation

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.