Real Estate Asia Built Environment Awards 2025
2 awards — Luxury Hospitality Interior Design of the Year — Indonesia, Resort Construction of the Year — Indonesia.

116 hotel rooms, 28.5–46.6 m²
Active construction · Q3 2027
Omotenashi — hospitality before the request is made



Satori is 38 villas and 116 hotel rooms in Nusa Dua under Accor management, designed around the principles of Quiet Luxury. The complex includes the Fusion restaurant, a pool bar, a spa, a fitness room, a pool with a lounge area, a kids' room, coworking and 24/7 concierge service — five minutes on foot from Pantai Sawangan. Leasehold 32+30 years with guaranteed extension at the tax (cadastral) value of the land.
Nusa Dua is the epicentre of premium tourism, known for its five-star hotels and fine-dining restaurants. Satori’s residences are just 5 minutes from the best beaches and 20 minutes from the international airport — concentrating all the infrastructure needed for both an exclusive lifestyle and successful investment.
HQC project location · Satori
Satori is operated by Accor under its hospitality standards — owners hold a managed asset, not a self-run one.
Shared pool & bar
Three pools across the resort grounds
Spa
A wellness suite for guests and owners
Rooftop
A pergola-shaded terrace and lounge bar
Restaurant
A managed dining room on site
Gym
A fitness room for residents
Kids’ room
A supervised space for families
Lobby
A staffed arrival and reception hall
24/7 reception
Round-the-clock front desk
Partner concierge
Booking, transfers and guest services
Gated & secured
A controlled, secured territory
Parking
On-site resident and guest parking






From elegant studios to exclusive villas with private pools — each designed for maximum comfort and privacy. Villas: 48–128 m², one to four bedrooms, one or two floors, private pool, turnkey furnished with ABB electrical systems. Rooms: 28.5–46.6 m², with ocean, mountain or garden aspects.

Preview shows the Loft Collection Big two-floor layout from the presentation source; full-resolution sheets are sent as part of the presentation.
| Typology | Area | View |
|---|---|---|
| Loft Collection (Big) | 46.7 m² | Pool view |
| Loft (Small) | 42.7 m² | Garden |
| Junior Suite | 34.2 m² | Pool view |
| Deluxe Tranquility | 28.6 m² | Garden |
| Suite | 44.6 m² | Top floor |
2 awards — Luxury Hospitality Interior Design of the Year — Indonesia, Resort Construction of the Year — Indonesia.
Satori is operated by Accor under its hospitality standards — owners hold a managed asset, not a self-run one.
Structural warranty scope includes frame, foundation, roof, pool shell, seismic and hydro insulation.
A 32-year lease with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.
A 32-year lease with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.
Frame, seismic and hydro insulation, finishes, joinery and MEP are installed by our own teams — not subcontracted away.
Natural materials — marble, teak, natural stone. Fully furnished and turnkey-equipped by HQC’s own furniture factory, with heated plumbing fixtures and smart locks; a backup generator ensures uninterrupted power supply. HQC’s own furniture factory guarantees unique design, quality control and precise furniture delivery timelines.

A 32-year leasehold with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.
Accor operates the residence under its hospitality standards; owners hold a managed asset, not a self-run one.
A 10-year structural guarantee on the hotel rooms and the villas alike, and a 12-month finishing guarantee — backed by our in-house MEP lab and furniture factory.
Pantai Sawangan is five minutes on foot; Mulia, Apurva Kempinski and St. Regis are all within the same kilometre, in the quiet south of Nusa Dua.
Yes — units are individually titled on the lease and can be transferred.
A fully finished, furnished and operator-ready unit; the detailed inventory is in the presentation pack.
10 years
10-year structural guarantee
12-month guarantee on finishing

Nusa Dua
Gated Japandi villa club — 75 villas, 1–4 bedrooms
Price on request
View
Bukit
61 keys — 58 apartments and 3 loft suites
Price on request
View
Bukit
Design hotel, 103 hotel rooms · Melasti
Price on request
ViewPrefer to talk first? Reach us directly.